Renewable Energy
PowerFromSun&Soil
Solar PV and biogas systems engineered for Kenyan homes, farms, and businesses.
kWp Solar Installed
Biogas Systems Built
CO₂ Offset Per Year
Avg. Energy Bill Cut
Solar Power
Harvest The Equator Sun
Kenya gets 5+ peak sun hours a day. We turn them into power — from 200Wp home kits to 120kWp commercial plants.

Safaricom 120kW — Eldoret
- 210 × 575W monocrystalline panels
- Grid-tie inverters & protection switchgear
- KPLC net-metering & commissioning
- 12-month O&M handover package
Biogas To Power
Waste In. Watts Out.
Your herd already produces tomorrow's cooking gas and electricity. Our fixed-dome digesters pay for themselves in 2–3 years.

1 cow ≈ 20kg of feedstock every day
Digester Sizing Guide
Type in your herd size — we'll highlight the right digester.
| Size (M³) | Herd Size | Labour Cost |
|---|---|---|
| 8 M³ | Up to 3 cows | KES 80,000 |
| 10 M³ | Up to 4 cows | KES 96,000 |
| 12 M³ | Up to 10 cows | KES 110,000 |
| 16 M³ | Up to 15 cows | KES 144,000 |
| 24 M³ | Up to 20 cows | KES 196,000 |
| 32 M³ | Up to 29 cows | KES 250,000 |
| 48 M³ | Up to 45 cows | KES 360,000 |
| 59 M³ | Up to 59 cows | KES 460,000 |
| 71 M³ | Up to 69 cows | KES 580,000 |
| 91 M³ | Up to 99 cows | KES 770,000 |
| 124 M³ | Up to 100 cows | KES 920,000 |
AKUT fixed-dome design · labour-only rates · site survey charged separately at KES 10,000
24M³ Digester — Laikipia
- Gas piped to farmhouse kitchen & lighting
- Bio-slurry channelled to paddock irrigation
- 70% cut in cooking fuel costs

Bills Down 70%
Sunshine is free. KPLC tariffs are not.
Power That Stays On
Battery + biogas backup through every blackout.
Payback In Under 6 Years
Then 20+ more years of near-free energy.
Ready To Cut The Cord?
Book a free energy audit — we'll size your system and show you the payback math.